Reservoir Simulation Study.

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering & Development Company (PEDEC)  and Iranian Offshore Oil Company (IOOC).

After a year of negotiation with NIOC Offshore Production Management, TPA succeeded to conclude an agreement to conduct a several field reservoir simulation study. For a reliable evaluation of the bulk and net rock volumes, and the original hydrocarbons in place – which are of utmost importance in assessing the economics of a reservoir development project and selecting the development schemes and exploitation strategy selecting the basic design and size of the production facilities.

This field is located in southern waters of the Persian Gulf.

 https://tpa-ir.com/index.php/en/service/field-development-studies

Full-field Reservoir Engineering Study and 3D Seismic Supervision.

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering & Development Company (PEDEC)  and Iranian Offshore Oil Company (IOOC).

Seismic Acquisition: To produce a seismic image of the subsurface, a seismic source must be generated and the resulting reflection data recorded by a field crew. In this way, land seismic data is created and recorded.

1.      Seismic Processing: Seismic sections are created from the raw data recorded by the field crew

2.       Seismic Interpretation: Horizons and structures are identified and the location of possible hydrocarbon reserves are mapped.

This field is located in southwest of the Ilam province.

 https://tpa-ir.com/index.php/en/service/field-development-studies

Full – Field Study and Master Development Plan.

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering & Development Company (PEDEC)  and Iranian Offshore Oil Company (IOOC).

NIOC awarded several projects to TPA . These study  include offshore and onshore fields  and covers geological evaluations, petrophysical interpretations, geological modeling, basic reservoir engineering, 3D compositional simulation modeling, performance predictions and design of optimal master development plan (MDP) for this giant complex fractured reservoir.

 https://tpa-ir.com/index.php/en/service/field-development-studies

Drilling Engineering

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering  & Development Company (PEDEC) and Iranian Offshore Oil Company (IOOC).

Consulting and supervision services of drilling engineering,drilling operations, reservoir full filed study and preliminary engineering of early production plant of oil and gas field development project.

Surface facilities :

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering & Development Company (PEDEC)  and Iranian Offshore Oil Company (IOOC).

Basic engineering services(FEED), work description and preparation of processing facilities oil and gas field development project.

Rig Services:

Client: National Iranian Oil Company (NIOC) and Petroleum Engineering & Development Company (PEDEC) and Iranian Offshore Oil Company (IOOC).

TPA management team decided to update their policies about TPA supplier rigs. in this new program TPA  company can "fully operates jack up drilling rigs" by its own capability. therefore for improving Iranian crew job vacancies and foundation of Iranian drilling rig management planned to recruit and train Iranian crew.

 https://tpa-ir.com/index.php/en/service/field-development-studies